Learn how Shape Aura’s recommendations help optimize compressor operations, improving energy efficiency and achieving a 1.2 MW reduction in consumption.
On October 9th, 2024, the operations team conducted tests with both Main B compressors running. After the tests were completed and the plant stabilized on October 11th, 2024, Shape Aura issued recommendation #176, advising adjustments to gas plant compressors to reach a more optimal operating point.
On October 11th, 2024, the operational adjustments outlined in recommendation #176 were initiated, and the implementation was confirmed as complete on October 12th, 2024.
Main A flawless implementation; Power Main A achieved savings of 389 kW
Main B flawless implementation; Power Main B achieved savings of 500 kW
Reinj implementation with a deviation on the discharge pressure; Power Reinj achieved savings of 309 kW; the savings could have been greater if not for the pressure issue.
The results indicate that recommendation #176 from Shape Aura successfully contributed to overall energy improvements in the unit's gas plant, leading to an average energy consumption reduction of 1,2 MW.
Recommendation #176 – Shape Aura Results